|
Production Diary Archive - September 2005
28th September 2005 – Rip's jump
If you haven’t already, check out this image of our Parkour advisor ‘Rip’.
Production Spy
27th September 2005 – Peerless effects
Almost all of the film has been achieved without the need for Visual Effects but there is one shot was just too dangerous to do. I can’t say more without giving too much away but needless to say it’ll blow you away!
Production Spy
14th September 2005 – Film edited and being graded
I’ve just come from a grading session at the Framestore CFC, London. Our colourist Ben is doing a marvellous job and the film looks great! I’ll get some screen shots as soon as I can.
Yours, Production Spy
5th September 2005 – It’s in the can!
The shoot is now over and the film is with the lab being processed. The shoot went very well and the weather held up beautifully (tans all round!).
Check out the Press section for photos
Production Spy
|